Is it possible to run two chases at the same time?

Ask a generic question about the usage of QLC+, not related to a particular operating system
Post Reply
Masatoshi
Posts: 25
Joined: Wed Apr 24, 2024 9:53 pm
Location: japan
Real Name: Masatoshi

I created a new Chase with additional and different equipment in the file where the first Chase was created.

Is there any way to run these at the same time?

Thank you in advance.
kenact
Posts: 434
Joined: Thu Apr 23, 2015 6:43 am
Real Name: Ken Coughlin

It is possible to run 2 Chases at the same time. In my last show I ran one Chase with my preshow music. In a second Chase I ran a video that that projected the image of my promotional flyer and the third Chase was running the main performance.

The Chases weren't synchronized, but they were all running at the same time.
Rhinesel
Posts: 35
Joined: Sun Feb 26, 2023 9:36 am
Real Name: Matthew Valeri

You can run two functions (chase, scenes, ect) together buy putting them in a collection. A collection fires off the contained functions at the same time. The collection can then go into a chase if you're using a traditional theater style "que stack". Note: if you usually set your timings in your chase menu, you will have to do the timings within the function editor when creating the functions and then add them to the collection.

QLC+ is like Inception. Things can go within things.
Post Reply