Syncing Chasers
Posted: Tue May 02, 2023 8:35 pm
Hi,
I'm struggling with this problem since years and never found a perfect solution:
I have for example 2 Chasers with 8 steps for fixture A and 2 Chasers with 8 steps for fixture B.
All chasers are controlled with the Speed Dial and the same duration factor. Chaser 1 for A and for B got started at the same time.
When I now switch from Chaser 1 to Chaser 2 on Fixture B, while the Chaser is e.g. at step 4, the Chasers on the 2 fixtures get out of sync (step 1 of Chaser 2 is now shown when step 5 of Chaser 1 is set).
Is there any way (beside putting all possible chaser combinations into a collection) to automatically synchronize the Chasers that the step 1 of Chaser 1 and step 1 of Chaser 2 are shown at the same time? Could be that the switch only happens when the Chaser has finished or some steps get skipped.
Thanks for the help
Greetings
andz
I'm struggling with this problem since years and never found a perfect solution:
I have for example 2 Chasers with 8 steps for fixture A and 2 Chasers with 8 steps for fixture B.
All chasers are controlled with the Speed Dial and the same duration factor. Chaser 1 for A and for B got started at the same time.
When I now switch from Chaser 1 to Chaser 2 on Fixture B, while the Chaser is e.g. at step 4, the Chasers on the 2 fixtures get out of sync (step 1 of Chaser 2 is now shown when step 5 of Chaser 1 is set).
Is there any way (beside putting all possible chaser combinations into a collection) to automatically synchronize the Chasers that the step 1 of Chaser 1 and step 1 of Chaser 2 are shown at the same time? Could be that the switch only happens when the Chaser has finished or some steps get skipped.
Thanks for the help
Greetings
andz